Step 8 · Install Nail Plates

Once you have confirmed there are no leaks, the final step is to protect your new plumbing. Install steel nail plates on the front edge of any stud where water or drain pipes pass through. These plates are hammered into the wood and will prevent future drywall screws or nails from accidentally puncturing your pipes. Your rough-in is now complete and the wall is ready for insulation and drywall.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Install Nail Plates

Once you have confirmed there are no leaks, the final step is to protect your new plumbing. Install steel nail plates on the front edge of any stud where water or drain pipes pass through. These plates are hammered into the wood and will prevent future drywall screws or nails from accidentally puncturing your pipes. Your rough-in is now complete and the wall is ready for insulation and drywall.

Videos for this step

Securing, Testing, and InsulatingPatch DrywallPrepare for Drywall Patch

Tools and Materials

← Project

How to Rough-In Plumbing for a Bathroom Vanity

Step 8 of 8·15 min left

Planning and Layout
30 mins4 itemsIntermediate
Shut Off Water and Drain System
20 minsBeginner
Run the Drain and Vent Line
1 min11 items
Install the Drain Stub-Out
20 mins9 itemsIntermediate
Run the Hot and Cold Water Supply Lines
45 mins5 itemsIntermediate
Install Supply Stub-Outs and Shutoff Valves
1 min11 itemsAdvanced
Test the System for Leaks
30 minsIntermediate
8
Install Nail Plates
15 mins2 itemsBeginner