Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Shut Off Water and Drain System

Locate the main water shutoff valve for the house and turn it completely off. Open the lowest faucet in the house (like a basement or outdoor spigot) and the highest faucet to drain all remaining water from the supply lines. This prevents water from spilling when you cut into the existing pipes. If you are tying into an existing drain stack, ensure no water is being run from fixtures above.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Shut Off Water and Drain System

Locate the main water shutoff valve for the house and turn it completely off. Open the lowest faucet in the house (like a basement or outdoor spigot) and the highest faucet to drain all remaining water from the supply lines. This prevents water from spilling when you cut into the existing pipes. If you are tying into an existing drain stack, ensure no water is being run from fixtures above.

Videos for this step

Shut Off Main Water SupplyShut Off Water SupplyShut Off Water Supply and Relieve Pressure

← Project

How to Rough-In Plumbing for a Bathroom Vanity

Step 2 of 8·2.2 hr left

Planning and Layout
30 mins4 itemsIntermediate
2
Shut Off Water and Drain System
20 minsBeginner
3
Run the Drain and Vent Line
1 min11 items
4
Install the Drain Stub-Out
20 mins9 itemsIntermediate
5
Run the Hot and Cold Water Supply Lines
45 mins5 itemsIntermediate
6
Install Supply Stub-Outs and Shutoff Valves
1 min11 itemsAdvanced
7
Test the System for Leaks
30 minsIntermediate
8
Install Nail Plates
15 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.