Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Test the System for Leaks

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

With the drain capped and the new angle stops in the closed position, you can now test for leaks. Go back to the main water shutoff valve and turn it on slowly to allow the pipes to fill gradually, which prevents water hammer. Return to the bathroom and carefully inspect all the new PEX connections and the threaded connections at the angle stops. Look and feel for any signs of moisture. For a more thorough test required by some codes, you can attach a pressure test gauge to one of the angle stops or an outdoor spigot and pressurize the system to check for any pressure drop over time.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Test the System for Leaks

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

With the drain capped and the new angle stops in the closed position, you can now test for leaks. Go back to the main water shutoff valve and turn it on slowly to allow the pipes to fill gradually, which prevents water hammer. Return to the bathroom and carefully inspect all the new PEX connections and the threaded connections at the angle stops. Look and feel for any signs of moisture. For a more thorough test required by some codes, you can attach a pressure test gauge to one of the angle stops or an outdoor spigot and pressurize the system to check for any pressure drop over time.

Videos for this step

Test System for LeaksTurn on Water and Check for LeaksTurn on Water and Test for Leaks

← Project

How to Rough-In Plumbing for a Bathroom Vanity

Step 7 of 8·45 min left

Planning and Layout
30 mins4 itemsIntermediate
Shut Off Water and Drain System
20 minsBeginner
Run the Drain and Vent Line
1 min11 items
Install the Drain Stub-Out
20 mins9 itemsIntermediate
Run the Hot and Cold Water Supply Lines
45 mins5 itemsIntermediate
Install Supply Stub-Outs and Shutoff Valves
1 min11 itemsAdvanced
7
Test the System for Leaks
30 minsIntermediate
8
Install Nail Plates
15 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.