Step 4 · Install the Drain Stub-Out

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

At the vanity location, install a 1.5-inch PVC 90-degree elbow onto the drain arm inside the wall. Cut a short piece of 1.5-inch PVC pipe (the stub-out) long enough to extend about 4-6 inches past where the finished wall will be. Use primer and cement to glue this stub-out into the elbow. Finally, place a temporary test cap on the end of the stub-out to prevent debris and sewer gas from entering the room.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Install the Drain Stub-Out

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

At the vanity location, install a 1.5-inch PVC 90-degree elbow onto the drain arm inside the wall. Cut a short piece of 1.5-inch PVC pipe (the stub-out) long enough to extend about 4-6 inches past where the finished wall will be. Use primer and cement to glue this stub-out into the elbow. Finally, place a temporary test cap on the end of the stub-out to prevent debris and sewer gas from entering the room.

Videos for this step

Glue cut piece into placePlan and Drill Drain HolesGlue the Santee and Vent Riser

Tools and Materials

← Project

How to Rough-In Plumbing for a Bathroom Vanity

Step 4 of 8·1.9 hr left

Planning and Layout
30 mins4 itemsIntermediate
Shut Off Water and Drain System
20 minsBeginner
Run the Drain and Vent Line
1 min11 items
4
Install the Drain Stub-Out
20 mins9 itemsIntermediate
5
Run the Hot and Cold Water Supply Lines
45 mins5 itemsIntermediate
6
Install Supply Stub-Outs and Shutoff Valves
1 min11 itemsAdvanced
7
Test the System for Leaks
30 minsIntermediate
8
Install Nail Plates
15 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.