Step 3 · Run the Drain and Vent Line

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

The vanity drain needs to connect to the home's main Drain-Waste-Vent (DWV) system. Using a drill with a 2-inch hole saw or auger bit, drill holes through the center of the studs leading from the vanity location to the main vertical drain stack. The holes must be pitched downwards towards the main stack at a rate of 1/4 inch per foot to ensure proper drainage. Use a level to verify the slope. Cut sections of 1.5-inch PVC pipe to run through the studs. You will need to cut into the main stack to install a new sanitary tee fitting that will accept the new vanity drain line. Dry fit all pieces first. Then, apply PVC primer to both the pipe end and the inside of the fitting, followed immediately by PVC cement, and firmly push the pipe into the fitting with a slight twist. Hold for 30 seconds.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Run the Drain and Vent Line

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

The vanity drain needs to connect to the home's main Drain-Waste-Vent (DWV) system. Using a drill with a 2-inch hole saw or auger bit, drill holes through the center of the studs leading from the vanity location to the main vertical drain stack. The holes must be pitched downwards towards the main stack at a rate of 1/4 inch per foot to ensure proper drainage. Use a level to verify the slope. Cut sections of 1.5-inch PVC pipe to run through the studs. You will need to cut into the main stack to install a new sanitary tee fitting that will accept the new vanity drain line. Dry fit all pieces first. Then, apply PVC primer to both the pipe end and the inside of the fitting, followed immediately by PVC cement, and firmly push the pipe into the fitting with a slight twist. Hold for 30 seconds.

Videos for this step

Install the Vent Pipe and Air Admittance Valve (AAV)Install Main Drain AssemblyConnect the Vent Pipe

Tools and Materials

← Project

How to Rough-In Plumbing for a Bathroom Vanity

Step 3 of 8·1.9 hr left

Planning and Layout
30 mins4 itemsIntermediate
Shut Off Water and Drain System
20 minsBeginner
3
Run the Drain and Vent Line
1 min11 items
4
Install the Drain Stub-Out
20 mins9 itemsIntermediate
5
Run the Hot and Cold Water Supply Lines
45 mins5 itemsIntermediate
6
Install Supply Stub-Outs and Shutoff Valves
1 min11 itemsAdvanced
7
Test the System for Leaks
30 minsIntermediate
8
Install Nail Plates
15 mins2 itemsBeginner