Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 9 · Pressurize System and Check for Leaks

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Ensure the faucet you opened earlier is still open. Close any other faucets. Go to the main shut-off valve near the tank and open it SLOWLY. This allows the system to fill gradually, preventing a violent 'water hammer' effect. Once water is flowing steadily from the open faucet, go to the electrical panel and turn the breaker for the well pump back to the 'ON' position. The pump should start. Immediately check all new pipe connections and fittings for any drips or leaks. Use a flashlight to get a clear view. If you see a leak, turn the power off, drain the system, and tighten or re-do the leaky connection.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 9 · Pressurize System and Check for Leaks

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Ensure the faucet you opened earlier is still open. Close any other faucets. Go to the main shut-off valve near the tank and open it SLOWLY. This allows the system to fill gradually, preventing a violent 'water hammer' effect. Once water is flowing steadily from the open faucet, go to the electrical panel and turn the breaker for the well pump back to the 'ON' position. The pump should start. Immediately check all new pipe connections and fittings for any drips or leaks. Use a flashlight to get a clear view. If you see a leak, turn the power off, drain the system, and tighten or re-do the leaky connection.

Videos for this step

Restore Water and TestTurn On Water and Check for LeaksTurn On Water and Power

Tools and Materials

← Project

How to Replace a Well Pressure Tank

Step 9 of 10·30 min left

Turn Off Power to Well Pump
5 mins1 itemsBeginner
Drain the System
15 mins2 itemsBeginner
Disconnect Plumbing and Electrical
20 mins4 itemsAdvanced
Remove the Old Tank
15 mins3 itemsAdvanced
Prepare and Pre-charge the New Tank
10 mins2 itemsIntermediate
Prepare and Install New Tank Tee Assembly
20 mins7 itemsAdvanced
Position and Connect the New Tank
20 mins7 itemsAdvanced
Reconnect Electrical Wiring
10 mins2 itemsIntermediate
9
Pressurize System and Check for Leaks
15 mins3 itemsIntermediate
10
Final Checks and System Purge
15 mins1 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.