Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Position and Connect the New Tank

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Carefully move the new, fully assembled pressure tank into its final position. Align the tank tee with the main water line coming from the pump. Reconnect the plumbing. If using threaded connections, apply Teflon tape and pipe dope. If using PVC, clean the pipe end and the fitting with PVC primer, then apply a liberal amount of PVC cement and push the two pieces together with a quarter-turn, holding for 30 seconds. Ensure the tank is stable and level on its base.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Position and Connect the New Tank

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Carefully move the new, fully assembled pressure tank into its final position. Align the tank tee with the main water line coming from the pump. Reconnect the plumbing. If using threaded connections, apply Teflon tape and pipe dope. If using PVC, clean the pipe end and the fitting with PVC primer, then apply a liberal amount of PVC cement and push the two pieces together with a quarter-turn, holding for 30 seconds. Ensure the tank is stable and level on its base.

Videos for this step

Prepare New Tank and FittingsRe-install Tank and Connect WaterReinstall Tank on Bowl

Tools and Materials

← Project

How to Replace a Well Pressure Tank

Step 7 of 10·1 hr left

Turn Off Power to Well Pump
5 mins1 itemsBeginner
Drain the System
15 mins2 itemsBeginner
Disconnect Plumbing and Electrical
20 mins4 itemsAdvanced
Remove the Old Tank
15 mins3 itemsAdvanced
Prepare and Pre-charge the New Tank
10 mins2 itemsIntermediate
Prepare and Install New Tank Tee Assembly
20 mins7 itemsAdvanced
7
Position and Connect the New Tank
20 mins7 itemsAdvanced
8
Reconnect Electrical Wiring
10 mins2 itemsIntermediate
9
Pressurize System and Check for Leaks
15 mins3 itemsIntermediate
10
Final Checks and System Purge
15 mins1 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.