Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Prepare and Install New Tank Tee Assembly

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Prepare the threads of your new tank tee, pressure gauge, and any other threaded fittings. Wrap the male threads with 3-4 layers of Teflon tape in a clockwise direction (the same direction you will tighten the fitting). After wrapping with tape, apply a thin layer of pipe dope over the tape. Screw the new tank tee into the threaded connection at the bottom of the pressure tank and tighten it securely with a pipe wrench. Then, install the pressure switch, pressure gauge, and pressure relief valve onto the appropriate ports of the tank tee, tightening each one.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Prepare and Install New Tank Tee Assembly

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Prepare the threads of your new tank tee, pressure gauge, and any other threaded fittings. Wrap the male threads with 3-4 layers of Teflon tape in a clockwise direction (the same direction you will tighten the fitting). After wrapping with tape, apply a thin layer of pipe dope over the tape. Screw the new tank tee into the threaded connection at the bottom of the pressure tank and tighten it securely with a pipe wrench. Then, install the pressure switch, pressure gauge, and pressure relief valve onto the appropriate ports of the tank tee, tightening each one.

Videos for this step

Prepare the New Expansion TankInstall New Expansion TankInstall the New Expansion Tank

Tools and Materials

← Project

How to Replace a Well Pressure Tank

Step 6 of 10·1.3 hr left

Turn Off Power to Well Pump
5 mins1 itemsBeginner
Drain the System
15 mins2 itemsBeginner
Disconnect Plumbing and Electrical
20 mins4 itemsAdvanced
Remove the Old Tank
15 mins3 itemsAdvanced
Prepare and Pre-charge the New Tank
10 mins2 itemsIntermediate
6
Prepare and Install New Tank Tee Assembly
20 mins7 itemsAdvanced
7
Position and Connect the New Tank
20 mins7 itemsAdvanced
8
Reconnect Electrical Wiring
10 mins2 itemsIntermediate
9
Pressurize System and Check for Leaks
15 mins3 itemsIntermediate
10
Final Checks and System Purge
15 mins1 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.