Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 10 · Final Checks and System Purge

With the pump running, watch the pressure gauge. The pressure should rise until it reaches the cut-out pressure (e.g., 50 PSI), at which point the pump should shut off. Now, close the faucet you had open. The system should hold pressure. Open a faucet elsewhere in the house and watch the gauge again. The pressure will drop, and when it hits the cut-in pressure (e.g., 30 PSI), the pump should turn back on. Let the pump run through a few cycles to confirm it is working correctly. Go around the house and open faucets one by one to purge any air trapped in the lines until they run smoothly.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 10 · Final Checks and System Purge

With the pump running, watch the pressure gauge. The pressure should rise until it reaches the cut-out pressure (e.g., 50 PSI), at which point the pump should shut off. Now, close the faucet you had open. The system should hold pressure. Open a faucet elsewhere in the house and watch the gauge again. The pressure will drop, and when it hits the cut-in pressure (e.g., 30 PSI), the pump should turn back on. Let the pump run through a few cycles to confirm it is working correctly. Go around the house and open faucets one by one to purge any air trapped in the lines until they run smoothly.

Videos for this step

Repressurize and Test SystemWater Filter Flushing and PurgingTest Thermal Expansion Bypass

Tools and Materials

← Project

How to Replace a Well Pressure Tank

Step 10 of 10·15 min left

Turn Off Power to Well Pump
5 mins1 itemsBeginner
Drain the System
15 mins2 itemsBeginner
Disconnect Plumbing and Electrical
20 mins4 itemsAdvanced
Remove the Old Tank
15 mins3 itemsAdvanced
Prepare and Pre-charge the New Tank
10 mins2 itemsIntermediate
Prepare and Install New Tank Tee Assembly
20 mins7 itemsAdvanced
Position and Connect the New Tank
20 mins7 itemsAdvanced
Reconnect Electrical Wiring
10 mins2 itemsIntermediate
Pressurize System and Check for Leaks
15 mins3 itemsIntermediate
10
Final Checks and System Purge
15 mins1 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.