Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 3 · Disconnect Plumbing and Electrical

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

First, carefully disconnect the electrical wires from the pressure switch. Use a screwdriver to loosen the terminal screws and pull the wires free. Next, use two pipe wrenches or a pipe wrench and channel-lock pliers to disconnect the main water line from the tank tee. Use one wrench on the fitting and the other on the tank tee itself, applying opposing force to prevent twisting the pipes. For PVC, you may need to cut the pipe with a hacksaw or PVC cutter if it is cemented in place.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Disconnect Plumbing and Electrical

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

First, carefully disconnect the electrical wires from the pressure switch. Use a screwdriver to loosen the terminal screws and pull the wires free. Next, use two pipe wrenches or a pipe wrench and channel-lock pliers to disconnect the main water line from the tank tee. Use one wrench on the fitting and the other on the tank tee itself, applying opposing force to prevent twisting the pipes. For PVC, you may need to cut the pipe with a hacksaw or PVC cutter if it is cemented in place.

Videos for this step

Disassemble and Inspect Inlet NippleRemove Old ValveRemove Old T&P Valve

Tools and Materials

← Project

How to Replace a Well Pressure Tank

Step 3 of 10·2.1 hr left

Turn Off Power to Well Pump
5 mins1 itemsBeginner
Drain the System
15 mins2 itemsBeginner
3
Disconnect Plumbing and Electrical
20 mins4 itemsAdvanced
4
Remove the Old Tank
15 mins3 itemsAdvanced
5
Prepare and Pre-charge the New Tank
10 mins2 itemsIntermediate
6
Prepare and Install New Tank Tee Assembly
20 mins7 itemsAdvanced
7
Position and Connect the New Tank
20 mins7 itemsAdvanced
8
Reconnect Electrical Wiring
10 mins2 itemsIntermediate
9
Pressurize System and Check for Leaks
15 mins3 itemsIntermediate
10
Final Checks and System Purge
15 mins1 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.