Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 9 · Allow Mortar to Cure

The installation is mechanically complete, but the mortar must fully cure to provide its final strength. Do not stand in, place tools in, or otherwise disturb the shower pan for at least 24 to 48 hours. Refer to the mortar bag for specific curing times. After the curing period, carefully step into the pan and walk around. It should feel completely solid and have zero flex or movement underfoot. This solid feel confirms a successful installation.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 9 · Allow Mortar to Cure

The installation is mechanically complete, but the mortar must fully cure to provide its final strength. Do not stand in, place tools in, or otherwise disturb the shower pan for at least 24 to 48 hours. Refer to the mortar bag for specific curing times. After the curing period, carefully step into the pan and walk around. It should feel completely solid and have zero flex or movement underfoot. This solid feel confirms a successful installation.

Videos for this step

Set the Shower TraySet and Level the PanSet Shower Pan

Tools and Materials

← Project

How to Install and Level a Shower Pan Base

Step 9 of 9·24 min left

Prepare the Installation Area
60 mins12 itemsAdvanced
Install the Drain Fitting
15 mins7 itemsIntermediate
Dry-Fit and Mark the Pan
20 mins4 itemsIntermediate
Prepare Subfloor and Drain Pipe
15 mins4 itemsAdvanced
Mix and Apply Mortar
20 mins9 items
Set and Level the Pan
15 mins4 items
Connect the Waste Drain
5 mins5 itemsAdvanced
Secure Flanges to Studs
15 mins3 itemsIntermediate
9
Allow Mortar to Cure
24 mins1 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.