Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Set and Level the Pan

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Remove the tape from the drain pipe. Carefully lower the shower pan onto the fresh mortar bed, guiding the drain fitting over the waste pipe. Press down firmly and evenly across the entire floor of the pan. You can walk in the pan (with clean shoes) to fully bed it into the mortar. Immediately place your 4-foot level on the pan's thresholds again. Check for level in all directions. Gently press down on any high spots to push the pan further into the mortar until it is perfectly level. The mortar should support the pan, and it should not rock.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Set and Level the Pan

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Remove the tape from the drain pipe. Carefully lower the shower pan onto the fresh mortar bed, guiding the drain fitting over the waste pipe. Press down firmly and evenly across the entire floor of the pan. You can walk in the pan (with clean shoes) to fully bed it into the mortar. Immediately place your 4-foot level on the pan's thresholds again. Check for level in all directions. Gently press down on any high spots to push the pan further into the mortar until it is perfectly level. The mortar should support the pan, and it should not rock.

Videos for this step

Dry Fit, Level, and MarkPosition Shower Pan and Install Drain FlangeSet the Shower Drain

Tools and Materials

← Project

How to Install and Level a Shower Pan Base

Step 6 of 9·59 min left

Prepare the Installation Area
60 mins12 itemsAdvanced
Install the Drain Fitting
15 mins7 itemsIntermediate
Dry-Fit and Mark the Pan
20 mins4 itemsIntermediate
Prepare Subfloor and Drain Pipe
15 mins4 itemsAdvanced
Mix and Apply Mortar
20 mins9 items
6
Set and Level the Pan
15 mins4 items
7
Connect the Waste Drain
5 mins5 itemsAdvanced
8
Secure Flanges to Studs
15 mins3 itemsIntermediate
9
Allow Mortar to Cure
24 mins1 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.