Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 3 · Dry-Fit and Mark the Pan

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Carefully place the shower pan into the alcove. Push it tight against the studs. Place a 4-foot level across the top edges (thresholds) of the pan. Check for level side-to-side and front-to-back. The pan's floor is pre-sloped, but the thresholds must be perfectly level. If the subfloor is uneven, you may need to use shims under the pan's feet to temporarily achieve level during this dry fit. This helps you understand how much mortar will be needed. Use a pencil to trace the location of the drain opening onto the subfloor and mark the height of the pan's top flange on each stud.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Dry-Fit and Mark the Pan

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Carefully place the shower pan into the alcove. Push it tight against the studs. Place a 4-foot level across the top edges (thresholds) of the pan. Check for level side-to-side and front-to-back. The pan's floor is pre-sloped, but the thresholds must be perfectly level. If the subfloor is uneven, you may need to use shims under the pan's feet to temporarily achieve level during this dry fit. This helps you understand how much mortar will be needed. Use a pencil to trace the location of the drain opening onto the subfloor and mark the height of the pan's top flange on each stud.

Videos for this step

Prepare the SubfloorInstall One-Piece Shower PanDry-Fit and Measure Drain Height

Tools and Materials

← Project

How to Install and Level a Shower Pan Base

Step 3 of 9·1.9 hr left

Prepare the Installation Area
60 mins12 itemsAdvanced
Install the Drain Fitting
15 mins7 itemsIntermediate
3
Dry-Fit and Mark the Pan
20 mins4 itemsIntermediate
4
Prepare Subfloor and Drain Pipe
15 mins4 itemsAdvanced
5
Mix and Apply Mortar
20 mins9 items
6
Set and Level the Pan
15 mins4 items
7
Connect the Waste Drain
5 mins5 itemsAdvanced
8
Secure Flanges to Studs
15 mins3 itemsIntermediate
9
Allow Mortar to Cure
24 mins1 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.