Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Mix and Apply Mortar

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

In a 5-gallon bucket, mix the mortar with water using a mixing paddle attached to a drill. Follow the manufacturer's ratio. Aim for a thick, stiff consistency, similar to packed sand or peanut butter. It should hold its shape and not be runny. Using a trowel, spread a layer of mortar 1 to 2 inches thick across the subfloor area where the pan will sit. Distribute it evenly in mounds, but leave a small open area immediately around the drain pipe to avoid getting mortar in the connection. Ensure the entire bottom of the pan will be supported.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Mix and Apply Mortar

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

In a 5-gallon bucket, mix the mortar with water using a mixing paddle attached to a drill. Follow the manufacturer's ratio. Aim for a thick, stiff consistency, similar to packed sand or peanut butter. It should hold its shape and not be runny. Using a trowel, spread a layer of mortar 1 to 2 inches thick across the subfloor area where the pan will sit. Distribute it evenly in mounds, but leave a small open area immediately around the drain pipe to avoid getting mortar in the connection. Ensure the entire bottom of the pan will be supported.

Videos for this step

Prepare Mortar BedMix and Apply MortarGather Tools and Materials

Tools and Materials

← Project

How to Install and Level a Shower Pan Base

Step 5 of 9·1.3 hr left

Prepare the Installation Area
60 mins12 itemsAdvanced
Install the Drain Fitting
15 mins7 itemsIntermediate
Dry-Fit and Mark the Pan
20 mins4 itemsIntermediate
Prepare Subfloor and Drain Pipe
15 mins4 itemsAdvanced
5
Mix and Apply Mortar
20 mins9 items
6
Set and Level the Pan
15 mins4 items
7
Connect the Waste Drain
5 mins5 itemsAdvanced
8
Secure Flanges to Studs
15 mins3 itemsIntermediate
9
Allow Mortar to Cure
24 mins1 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.