Step 4 · Add Base Gravel Layer

Spread a 4-6 inch layer of clean, washed gravel (typically 3/4 inch crushed stone) evenly over the landscape fabric at the bottom of the trench. This layer provides a drainage base and supports the perforated pipe. Ensure the gravel layer also follows the desired slope.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Add Base Gravel Layer

Spread a 4-6 inch layer of clean, washed gravel (typically 3/4 inch crushed stone) evenly over the landscape fabric at the bottom of the trench. This layer provides a drainage base and supports the perforated pipe. Ensure the gravel layer also follows the desired slope.

Videos for this step

Add a Base Layer of GravelAdd Initial Gravel LayerPour Gravel Bedding

Tools and Materials

← Project

French Drain Installation

Step 4 of 10·13 hr left

Mark the Drain Path
60 minutes4 items
Excavate the Trench
480 minutes5 items
Lay Landscape Fabric
120 minutes2 items
4
Add Base Gravel Layer
180 minutes3 items
5
Position the Perforated Pipe
60 minutes2 items
6
Fill with Gravel
240 minutes3 items
7
Wrap with Landscape Fabric
60 minutes2 items
8
Backfill the Trench
180 minutes3 items
9
Connect to Discharge Point
30 minutes2 items
10
Test the System
30 minutes1 items