Step 2 · Excavate the Trench

Dig the trench along the string line, starting from the discharge end and working towards the collection point. The trench should be approximately 12-18 inches wide and at least 18-24 inches deep to accommodate the perforated pipe, gravel, and soil. Maintain the consistent 1/4 inch per foot slope throughout the trench. Use a shovel and a digging bar. Periodically check the depth and slope with your measuring tape and line level.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Excavate the Trench

Dig the trench along the string line, starting from the discharge end and working towards the collection point. The trench should be approximately 12-18 inches wide and at least 18-24 inches deep to accommodate the perforated pipe, gravel, and soil. Maintain the consistent 1/4 inch per foot slope throughout the trench. Use a shovel and a digging bar. Periodically check the depth and slope with your measuring tape and line level.

Videos for this step

Dig the Trench with Proper SlopeExcavate Drainage TrenchDig Trench and Lay Corrugated Pipe

Tools and Materials

← Project

French Drain Installation

Step 2 of 10·23 hr left

Mark the Drain Path
60 minutes4 items
2
Excavate the Trench
480 minutes5 items
3
Lay Landscape Fabric
120 minutes2 items
4
Add Base Gravel Layer
180 minutes3 items
5
Position the Perforated Pipe
60 minutes2 items
6
Fill with Gravel
240 minutes3 items
7
Wrap with Landscape Fabric
60 minutes2 items
8
Backfill the Trench
180 minutes3 items
9
Connect to Discharge Point
30 minutes2 items
10
Test the System
30 minutes1 items