Step 1 · Mark the Drain Path

Use stakes to mark the center line of your French drain trench. Run a string line between the stakes, tensioned tightly. Ensure the string line has a consistent downward slope of approximately 1/4 inch per linear foot towards the planned discharge area to facilitate water flow. You can check the slope using a line level or a laser level.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Mark the Drain Path

Use stakes to mark the center line of your French drain trench. Run a string line between the stakes, tensioned tightly. Ensure the string line has a consistent downward slope of approximately 1/4 inch per linear foot towards the planned discharge area to facilitate water flow. You can check the slope using a line level or a laser level.

Videos for this step

Assess and Plan the Drainage SystemPlan the LocationDig the Trench with Proper Slope

Tools and Materials

← Project

French Drain Installation

Step 1 of 10·24 hr left

1
Mark the Drain Path
60 minutes4 items
2
Excavate the Trench
480 minutes5 items
3
Lay Landscape Fabric
120 minutes2 items
4
Add Base Gravel Layer
180 minutes3 items
5
Position the Perforated Pipe
60 minutes2 items
6
Fill with Gravel
240 minutes3 items
7
Wrap with Landscape Fabric
60 minutes2 items
8
Backfill the Trench
180 minutes3 items
9
Connect to Discharge Point
30 minutes2 items
10
Test the System
30 minutes1 items