Step 5 · Install Risers and Fill Gaps

If using separate riser stones, place them vertically against the front edge of each tread, ensuring they are plumb and stable. You may need to use smaller stones or gravel to shim them into place. Backfill behind the riser stones with gravel or soil to provide support. Fill any remaining gaps between the treads and risers with smaller stones, gravel, or polymeric sand, ensuring a tight fit and a neat appearance. Sweep away excess material.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Install Risers and Fill Gaps

If using separate riser stones, place them vertically against the front edge of each tread, ensuring they are plumb and stable. You may need to use smaller stones or gravel to shim them into place. Backfill behind the riser stones with gravel or soil to provide support. Fill any remaining gaps between the treads and risers with smaller stones, gravel, or polymeric sand, ensuring a tight fit and a neat appearance. Sweep away excess material.

Videos for this step

Build Subsequent Risers and Place TreadsConstruct Subsequent Tiers of StepsInstall Filler Stones and Rebar

Tools and Materials

← Project

How to Build Stone Steps in a Garden

Step 5 of 6·4 hr left

Mark and Excavate the Garden Stone Steps Area
240 minutes7 items
Install Drainage and Gravel Base
180 minutes5 items
Prepare the Sand Setting Bed
60 minutes4 items
Select and Lay the Stone Treads
300 minutes6 items
5
Install Risers and Fill Gaps
150 minutes5 items
6
Finishing Touches and Site Cleanup
90 minutes3 items