Step 3 · Prepare the Sand Setting Bed

Spread a uniform layer of coarse sand, approximately 1-2 inches deep, over the compacted gravel base. Use a screed board (a straight piece of lumber) to level the sand, ensuring it is perfectly flat and consistent in depth. This sand bed will allow for minor adjustments when placing the stone treads.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Prepare the Sand Setting Bed

Spread a uniform layer of coarse sand, approximately 1-2 inches deep, over the compacted gravel base. Use a screed board (a straight piece of lumber) to level the sand, ensuring it is perfectly flat and consistent in depth. This sand bed will allow for minor adjustments when placing the stone treads.

Videos for this step

Prepare Paver Sand Bedding LayerLevel Sand Bed & Lay StonesScreeding the Sand Setting Bed with Bars

Tools and Materials

← Project

How to Build Stone Steps in a Garden

Step 3 of 6·10 hr left

Mark and Excavate the Garden Stone Steps Area
240 minutes7 items
Install Drainage and Gravel Base
180 minutes5 items
3
Prepare the Sand Setting Bed
60 minutes4 items
4
Select and Lay the Stone Treads
300 minutes6 items
5
Install Risers and Fill Gaps
150 minutes5 items
6
Finishing Touches and Site Cleanup
90 minutes3 items