Step 4 · Select and Lay the Stone Treads

Carefully select the largest and flattest stones for the primary treads. Begin laying the first tread at the bottom of the steps, pressing it firmly into the sand bed. Use a rubber mallet to gently tap the stone into place, ensuring it is level and sits securely. Check for levelness in all directions. Continue laying subsequent treads, staggering them slightly if desired for a more natural look, ensuring each tread is level and has a consistent rise between them. The typical rise for garden steps is 6-8 inches.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Select and Lay the Stone Treads

Carefully select the largest and flattest stones for the primary treads. Begin laying the first tread at the bottom of the steps, pressing it firmly into the sand bed. Use a rubber mallet to gently tap the stone into place, ensuring it is level and sits securely. Check for levelness in all directions. Continue laying subsequent treads, staggering them slightly if desired for a more natural look, ensuring each tread is level and has a consistent rise between them. The typical rise for garden steps is 6-8 inches.

Videos for this step

Place the First Tread with a BullnoseInstall Natural Stone StepsInstall Black Hills Natural Stone Steps

Tools and Materials

← Project

How to Build Stone Steps in a Garden

Step 4 of 6·9 hr left

Mark and Excavate the Garden Stone Steps Area
240 minutes7 items
Install Drainage and Gravel Base
180 minutes5 items
Prepare the Sand Setting Bed
60 minutes4 items
4
Select and Lay the Stone Treads
300 minutes6 items
5
Install Risers and Fill Gaps
150 minutes5 items
6
Finishing Touches and Site Cleanup
90 minutes3 items