Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Backfill and Compact

After the timbers are secured, backfill the space behind each timber with gravel or compacted soil. Gravel is preferable as it aids in drainage and prevents water from pooling against the timbers, which can lead to rot. Compact the backfill material thoroughly with a tamping tool or by hand to create a solid structure and prevent settling over time.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Backfill and Compact

After the timbers are secured, backfill the space behind each timber with gravel or compacted soil. Gravel is preferable as it aids in drainage and prevents water from pooling against the timbers, which can lead to rot. Compact the backfill material thoroughly with a tamping tool or by hand to create a solid structure and prevent settling over time.

Videos for this step

Backfill and Level the GroundInstall Geotextile and BackfillBackfill the Wall

Tools and Materials

← Project

How to Build Backyard Steps with Railroad Ties or Landscape Timbers

Step 6 of 7·4 hr left

Plan the Step Location and Dimensions
120 minutes5 items
Excavate for the First Step
90 minutes3 items
Cut and Position the First Timber
60 minutes4 items
Prepare and Position Subsequent Timbers
90 minutes4 items
Secure the Timbers
120 minutes5 items
6
Backfill and Compact
180 minutes4 items
7
Add Finishing Touches and Test Stability
60 minutes2 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.