Step 2 · Excavate for the First Step

Excavate the area where the first railroad tie or landscape timber will be placed. The depth of the excavation should be sufficient to allow the timber to sit slightly below or flush with the surrounding ground level, depending on your design. This creates a more integrated and stable base. Ensure the bottom of the excavation is level and compacted to prevent settling.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Excavate for the First Step

Excavate the area where the first railroad tie or landscape timber will be placed. The depth of the excavation should be sufficient to allow the timber to sit slightly below or flush with the surrounding ground level, depending on your design. This creates a more integrated and stable base. Ensure the bottom of the excavation is level and compacted to prevent settling.

Videos for this step

Position, Level, and Anchor First StepPosition and Level TiesDig Trench and Level First Base

Tools and Materials

← Project

How to Build Backyard Steps with Railroad Ties or Landscape Timbers

Step 2 of 7·10 hr left

Plan the Step Location and Dimensions
120 minutes5 items
2
Excavate for the First Step
90 minutes3 items
3
Cut and Position the First Timber
60 minutes4 items
4
Prepare and Position Subsequent Timbers
90 minutes4 items
5
Secure the Timbers
120 minutes5 items
6
Backfill and Compact
180 minutes4 items
7
Add Finishing Touches and Test Stability
60 minutes2 items