Backfill and Level the Ground — Backfill and Compact
Part of project
How to Build Backyard Steps with Railroad Ties or Landscape Timbers · Step 6 of 7
In this video
After all timbers are installed, backfill the remaining excavated areas with soil. Use shovels to move soil into place and rakes to spread it evenly around and between the steps. The ground is then thoroughly watered with a hose to help settle the soil and eliminate air pockets, which prevents future settling and erosion. This ensures a clean and finished look.
TranscriptHide
Auto-generated transcript. May contain errors.
Backfill and Level the Ground — Backfill and Compact
Part of project
How to Build Backyard Steps with Railroad Ties or Landscape Timbers · Step 6 of 7
In this video
After all timbers are installed, backfill the remaining excavated areas with soil. Use shovels to move soil into place and rakes to spread it evenly around and between the steps. The ground is then thoroughly watered with a hose to help settle the soil and eliminate air pockets, which prevents future settling and erosion. This ensures a clean and finished look.
Video Transcript
(799 characters)Hide
Video Transcript
(799 characters)Transcript may be auto-generated and contain errors.