Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Prepare and Position Subsequent Timbers

For each subsequent step, cut another railroad tie or landscape timber to the desired width. Place this new timber directly behind the first one, creating the next riser. The top surface of this new timber will serve as the tread for the step above it. Ensure the spacing between the timbers maintains the planned run for your steps. Use a level to ensure each timber is horizontally true and that the rise between steps is consistent.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Prepare and Position Subsequent Timbers

For each subsequent step, cut another railroad tie or landscape timber to the desired width. Place this new timber directly behind the first one, creating the next riser. The top surface of this new timber will serve as the tread for the step above it. Ensure the spacing between the timbers maintains the planned run for your steps. Use a level to ensure each timber is horizontally true and that the rise between steps is consistent.

Videos for this step

Assemble and Secure Step TimbersPosition and Level TiesConstruct Remaining Steps and Treads

Tools and Materials

← Project

How to Build Backyard Steps with Railroad Ties or Landscape Timbers

Step 4 of 7·7.5 hr left

Plan the Step Location and Dimensions
120 minutes5 items
Excavate for the First Step
90 minutes3 items
Cut and Position the First Timber
60 minutes4 items
4
Prepare and Position Subsequent Timbers
90 minutes4 items
5
Secure the Timbers
120 minutes5 items
6
Backfill and Compact
180 minutes4 items
7
Add Finishing Touches and Test Stability
60 minutes2 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.