Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 8 · Prepare for Finishing

Using sandpaper or a sanding block, smooth out any rough edges or surfaces on the framing and shelving. Apply wood filler to all visible screw or nail holes and allow it to dry completely. Once dry, sand the filled areas smooth. Finally, wipe down all surfaces with a damp cloth or tack cloth to remove dust.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Prepare for Finishing

Using sandpaper or a sanding block, smooth out any rough edges or surfaces on the framing and shelving. Apply wood filler to all visible screw or nail holes and allow it to dry completely. Once dry, sand the filled areas smooth. Finally, wipe down all surfaces with a damp cloth or tack cloth to remove dust.

Videos for this step

Fill Imperfections and Sand SmoothApply Wood Filler and Sand SmoothFill and Sand Imperfections

Tools and Materials

← Project

How to Build a Coat and Shoe Nook Under the Stairs

Step 8 of 9·4 hr left

Measure and Mark the Nook Dimensions
60 minutes3 items
Cut Framing Lumber
120 minutes4 items
Assemble the Nook Frame
180 minutes3 items
Install the Nook Frame
90 minutes3 items
Frame Interior Shelving or Cubbies
150 minutes5 items
Install Shelving Material
120 minutes4 items
Install Backing Material (Optional)
90 minutes5 items
8
Prepare for Finishing
60 minutes5 items
9
Apply Finish (Paint or Stain)
180 minutes7 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.