Step 4 · Install the Nook Frame

Carefully position the assembled frame within the marked dimensions under the stairs. Use a level to ensure it is plumb and square. Fasten the frame to the existing structure using appropriate screws or lag bolts. If fastening to a concrete floor, use concrete anchors. Ensure the frame is rigidly attached and can support the weight of shelves and items placed within the nook.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Install the Nook Frame

Carefully position the assembled frame within the marked dimensions under the stairs. Use a level to ensure it is plumb and square. Fasten the frame to the existing structure using appropriate screws or lag bolts. If fastening to a concrete floor, use concrete anchors. Ensure the frame is rigidly attached and can support the weight of shelves and items placed within the nook.

Videos for this step

Install Frame in HallwayInstall Modular Shelving FramesInstall Cabinet Frame into Opening

Tools and Materials

← Project

How to Build a Coat and Shoe Nook Under the Stairs

Step 4 of 9·11.5 hr left

Measure and Mark the Nook Dimensions
60 minutes3 items
Cut Framing Lumber
120 minutes4 items
Assemble the Nook Frame
180 minutes3 items
4
Install the Nook Frame
90 minutes3 items
5
Frame Interior Shelving or Cubbies
150 minutes5 items
6
Install Shelving Material
120 minutes4 items
7
Install Backing Material (Optional)
90 minutes5 items
8
Prepare for Finishing
60 minutes5 items
9
Apply Finish (Paint or Stain)
180 minutes7 items