Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 1 · Measure and Mark the Nook Dimensions

Utilize a tape measure to accurately determine the length, width, and height of the space beneath the staircase. Transfer these measurements to the existing structure (wall, floor) using a pencil and a level to ensure straight lines. Account for any obstructions like pipes or electrical conduits. Mark the locations where the new framing members will attach.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Measure and Mark the Nook Dimensions

Utilize a tape measure to accurately determine the length, width, and height of the space beneath the staircase. Transfer these measurements to the existing structure (wall, floor) using a pencil and a level to ensure straight lines. Account for any obstructions like pipes or electrical conduits. Mark the locations where the new framing members will attach.

Videos for this step

Establish Layout and Guide PlacementConstruct Main Support Frame

Tools and Materials

← Project

How to Build a Coat and Shoe Nook Under the Stairs

Step 1 of 9·17.5 hr left

1
Measure and Mark the Nook Dimensions
60 minutes3 items
2
Cut Framing Lumber
120 minutes4 items
3
Assemble the Nook Frame
180 minutes3 items
4
Install the Nook Frame
90 minutes3 items
5
Frame Interior Shelving or Cubbies
150 minutes5 items
6
Install Shelving Material
120 minutes4 items
7
Install Backing Material (Optional)
90 minutes5 items
8
Prepare for Finishing
60 minutes5 items
9
Apply Finish (Paint or Stain)
180 minutes7 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.