Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Cut Framing Lumber

Using a circular saw or miter saw, cut the 2x4 lumber into studs, plates, and cripples according to the measurements taken. For angled cuts, such as where the framing meets the stairs, set your saw to the appropriate angle. Ensure all cuts are clean and precise.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Cut Framing Lumber

Using a circular saw or miter saw, cut the 2x4 lumber into studs, plates, and cripples according to the measurements taken. For angled cuts, such as where the framing meets the stairs, set your saw to the appropriate angle. Ensure all cuts are clean and precise.

Videos for this step

Cut Framing LumberMeasure and Cut Framing LumberCut Lumber and Mark Openings on Plates

Tools and Materials

← Project

How to Build a Coat and Shoe Nook Under the Stairs

Step 2 of 9·16.5 hr left

Measure and Mark the Nook Dimensions
60 minutes3 items
2
Cut Framing Lumber
120 minutes4 items
3
Assemble the Nook Frame
180 minutes3 items
4
Install the Nook Frame
90 minutes3 items
5
Frame Interior Shelving or Cubbies
150 minutes5 items
6
Install Shelving Material
120 minutes4 items
7
Install Backing Material (Optional)
90 minutes5 items
8
Prepare for Finishing
60 minutes5 items
9
Apply Finish (Paint or Stain)
180 minutes7 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.