Step 4 · Run Refrigerant Lines and Electrical Wiring

Drill a hole through the exterior wall for the refrigerant lines and electrical conduit. Feed the copper refrigerant lines (suction line and liquid line) and the low-voltage control wiring from the outdoor unit location to the indoor unit location. Ensure the lines are properly insulated to prevent energy loss and condensation. Use a conduit to protect the wiring and refrigerant lines where they pass through the wall. Connect the control wiring to the appropriate terminals on both units according to the wiring diagrams.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Run Refrigerant Lines and Electrical Wiring

Drill a hole through the exterior wall for the refrigerant lines and electrical conduit. Feed the copper refrigerant lines (suction line and liquid line) and the low-voltage control wiring from the outdoor unit location to the indoor unit location. Ensure the lines are properly insulated to prevent energy loss and condensation. Use a conduit to protect the wiring and refrigerant lines where they pass through the wall. Connect the control wiring to the appropriate terminals on both units according to the wiring diagrams.

Videos for this step

Connect Outdoor Unit Wiring and Refrigerant LinesConnect Line Set to Indoor Unit and Route Through WallInstall Outdoor Condenser and Test System

Tools and Materials

← Project

Air Conditioner Installation

Step 4 of 10·10 hr left

Prepare the Outdoor Unit Location
60 minutes4 items
Mount the Outdoor Unit
30 minutes3 items
Install the Evaporator Coil (Indoor Unit)
120 minutes6 items
4
Run Refrigerant Lines and Electrical Wiring
180 minutes8 items
5
Connect Electrical Power to the Outdoor Unit
90 minutes7 items
6
Evacuate and Charge Refrigerant Lines
120 minutes7 items
7
Leak Test Refrigerant Lines
45 minutes4 items
8
Connect Indoor Unit Electrical Power
60 minutes5 items
9
Perform System Startup and Testing
60 minutes4 items
10
Final Checks and Commissioning
45 minutes4 items