Step 2 · Mount the Outdoor Unit

Carefully lift and place the outdoor air conditioning unit onto the prepared concrete pad or frame. Ensure it is centered and stable. If required by the manufacturer or local codes, secure the unit to the pad using anchor bolts or straps to prevent shifting, especially in areas prone to high winds or seismic activity.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Mount the Outdoor Unit

Carefully lift and place the outdoor air conditioning unit onto the prepared concrete pad or frame. Ensure it is centered and stable. If required by the manufacturer or local codes, secure the unit to the pad using anchor bolts or straps to prevent shifting, especially in areas prone to high winds or seismic activity.

Videos for this step

Position and Secure Outdoor Condenser UnitPlace Outdoor CondenserPosition Outdoor Condenser

Tools and Materials

← Project

Air Conditioner Installation

Step 2 of 10·12.5 hr left

Prepare the Outdoor Unit Location
60 minutes4 items
2
Mount the Outdoor Unit
30 minutes3 items
3
Install the Evaporator Coil (Indoor Unit)
120 minutes6 items
4
Run Refrigerant Lines and Electrical Wiring
180 minutes8 items
5
Connect Electrical Power to the Outdoor Unit
90 minutes7 items
6
Evacuate and Charge Refrigerant Lines
120 minutes7 items
7
Leak Test Refrigerant Lines
45 minutes4 items
8
Connect Indoor Unit Electrical Power
60 minutes5 items
9
Perform System Startup and Testing
60 minutes4 items
10
Final Checks and Commissioning
45 minutes4 items