Step 1 · Prepare the Outdoor Unit Location

Select a level spot for the outdoor unit, at least 18 inches from the house and with adequate airflow around it. Remove any debris, rocks, or vegetation from the designated area. Ensure the ground is firm and can support the weight of the unit. A pre-cast concrete pad or a sturdy, level frame is recommended.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Prepare the Outdoor Unit Location

Select a level spot for the outdoor unit, at least 18 inches from the house and with adequate airflow around it. Remove any debris, rocks, or vegetation from the designated area. Ensure the ground is firm and can support the weight of the unit. A pre-cast concrete pad or a sturdy, level frame is recommended.

Videos for this step

Position Outdoor CondenserPosition and Secure Outdoor Condenser UnitPrepare Outdoor Unit Site and Concrete Pad

Tools and Materials

← Project

Air Conditioner Installation

Step 1 of 10·13.5 hr left

1
Prepare the Outdoor Unit Location
60 minutes4 items
2
Mount the Outdoor Unit
30 minutes3 items
3
Install the Evaporator Coil (Indoor Unit)
120 minutes6 items
4
Run Refrigerant Lines and Electrical Wiring
180 minutes8 items
5
Connect Electrical Power to the Outdoor Unit
90 minutes7 items
6
Evacuate and Charge Refrigerant Lines
120 minutes7 items
7
Leak Test Refrigerant Lines
45 minutes4 items
8
Connect Indoor Unit Electrical Power
60 minutes5 items
9
Perform System Startup and Testing
60 minutes4 items
10
Final Checks and Commissioning
45 minutes4 items