Skip to main content

Construct and Install Landing — Design the Landing

Beginner4 hours

Part of project

How to Plan an L-Shaped Staircase Layout · Step 4 of 6

Helpful?

In this video

Before installing the stringers, you must build and install the landing where the stairs will connect. First, determine the exact location and height of your landing based on your calculations (Step 2) and local codes (Step 1). Use a level and a long straightedge to mark a level line on the wall where the top of the landing frame will be. Build the landing frame using appropriate lumber (e.g., 2x8s), ensuring it's square and plumb. Secure the landing frame to the wall studs using structural lag screws where possible, and use joist hangers for any interior joists that connect to the main frame. Apply construction adhesive to the top of the joists, then install Advantech subfloor panels, nailing them down securely. Ensure the subfloor is also level.

7.6K views486
Transcript
Hide

totally fine. Now that that stringer is clamped to the next board that needs cut out, we just have to use our pen and trace right around the stringer, and that's going to place our layout on the board. Now that we have our layout on the next board, we can remove the stringer and cut it out. I now have the exact layout of the first stringer onto this board to cut out for our second stringer, and cutting this out is going to be the exact same method as we did cutting out the first stringer. I wanted to point out, as you can see the difference here on the tip, just because of the width of the board is different. This is a clip of cutting a stringer out using a sawzall. You can see if you take your time and go really slow, it actually is not a big deal to use a sawzall, but I wanted to point out that you do got to be careful, and if you do this, just make sure that you stop the blade in time before it cuts into the carriage of the stringer, and that's essentially the biggest thing you got to watch out for. And a little tip after you have all three stringers cut out, if you line them all up together, the rise and run should all line up perfectly. Tip number seven, know your landing. Now that we have our stringers cut out, we need to install them, and we must have a landing to set them on. So, I'm going to show you exactly how to figure how far back we have to build our landing to adequately catch the stringer. And another thing, too, you'll need to know the flooring thickness that's going to be on your landing. In our case, we're not placing flooring here because it's coming down to his basement, and it doesn't have to be finished. So, that's going to be something that we chose to do, but most landings are going to have hardwood floor or LVL floor, so you need to know what that's going to be, so you know the height in order to build your landing. I'm going to show you an easy way to figure how far back to frame your landing. I'm here at the top of the stair opening, and this is where the stairs are going to begin coming down. Now, we need to mark exactly where to place the top of the stringer. I'm going to sit the 3/4 in subfloor on top of the regular subfloor, that's going to represent our 3/4 in hardwood. If you're going to use 1/2 in flooring, I recommend getting a piece of the flooring and sitting on top and pulling down from. So, if this is the top of our hardwood floor, we must come down 9 and 1/8. And the reason why that is, if we have 7 and 9/16 plus…

Auto-generated transcript. May contain errors.