Install Stair Risers — Cut and Install Risers (Optional but Recommended)

Intermediate5 mins

Part of project

How to Build Basement Stairs · Step 7 of 9

Helpful?

In this video

With the stringers securely in place, begin installing the risers. Risers are the vertical boards that close the gap between treads. For each step, hold a riser board (e.g., 1x8 material) flush against the top of the preceding run, ensuring it's square and level. Use a speed square to butt it up perfectly. Nail the riser into the stringers using a finish nailer. Repeat this process for all risers, working your way up the stairs. For the bottom risers, fill any gaps beneath them with small wood blocks and nail them into place.

7.6K views486
Transcript
Hide

You can see that the stairs are starting to take shape and going down to the landing comfortable. Now, I'm placing the bottom set of stairs going down to the concrete, and this is more or less the same idea as we did from above this area, except we only have three steps going down to the concrete. And something very important to do is to place some type of vapor barrier if you're going to be using standard lumber like I'm doing here against the concrete because moisture will rot out the standard lumber over time. I'm using a miter saw to cut the risers and the treads. A sliding miter saw is ideal because it will give you the best cuts whenever you're cutting multiple treads and risers. Now that I have the one baits cut down for the risers, I'd like to point out a couple things. One, I had to rip down this bottom to fit because obviously it's not going to be the same rise as the middle section. And two, the top is the opposite. We're going to need to use something a little wider in order to fill this in. So, we got a wider board for our top riser. And again, our bottom, we have one already ripped down ready to go. And that's going to be this one. And something very important you want to do whenever you shoot these on, you want to make sure that you're flush with the top of the run or where the tread's going to be because if it's any lower, clearly you're going to see underneath of the tread. So, we need to use our speed square and hold it on the top where the tread's going to go and butt your riser right up to it. And I'm going to shoot them on using a finish nailer. I'm now going to go ahead and install this finished board against the landing. And again, this one's wider, as you can see, and the treads going to cover up this bottom gap. So, we're going to hold it flush with the top of the subfloor. And that's all there is to installing the risers. Now, I'm going to do that up the next flight of stairs. I like to install all the risers first because I just have my trim nailer in hand while doing this. Now, if I'm installing the treads and the risers at the same time, I got to rotate between the drill, impact driver, and the nail gun. I find it much slower, so I like to do all the risers first, as you can see here, because it seems to be quicker. Now that

Auto-generated transcript. May contain errors.