Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Install the New Window

Carefully lift the new window unit into the rough opening. Ensure it is centered and sits flush against the shims. Use a level to confirm it is plumb and level in all directions. If necessary, add or adjust shims to ensure the window is perfectly seated.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Install the New Window

Carefully lift the new window unit into the rough opening. Ensure it is centered and sits flush against the shims. Use a level to confirm it is plumb and level in all directions. If necessary, add or adjust shims to ensure the window is perfectly seated.

Videos for this step

Install New WindowInstall New WindowsInstall and Secure New Window Frame

Tools and Materials

← Project

Window Replacement

Step 6 of 10·3.5 hr left

Prepare the Window Opening
30 minutes4 items
Remove the Old Window Sash
45 minutes5 items
Remove the Old Window Frame
60 minutes6 items
Inspect and Prepare the Rough Opening
45 minutes6 items
Apply Flashing Tape
30 minutes2 items
6
Install the New Window
45 minutes4 items
7
Secure the New Window
60 minutes3 items
8
Apply Exterior Sealant
30 minutes4 items
9
Install Interior Trim and Sealant
60 minutes8 items
10
Test the New Window
15 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.