Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Apply Flashing Tape

Apply flashing tape to the sill (bottom) of the opening first, extending it up the sides by about 6 inches. Then, apply flashing tape to the jambs (sides) of the opening, ensuring it overlaps the sill tape. Finally, apply flashing tape to the head (top) of the opening, overlapping the side jamb tapes. This creates a continuous seal against water intrusion.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Apply Flashing Tape

Apply flashing tape to the sill (bottom) of the opening first, extending it up the sides by about 6 inches. Then, apply flashing tape to the jambs (sides) of the opening, ensuring it overlaps the sill tape. Finally, apply flashing tape to the head (top) of the opening, overlapping the side jamb tapes. This creates a continuous seal against water intrusion.

Videos for this step

Apply Exterior Flashing TapeApply Side Flashing TapeApply Sill and Side Flashing Tape

Tools and Materials

← Project

Window Replacement

Step 5 of 10·4 hr left

Prepare the Window Opening
30 minutes4 items
Remove the Old Window Sash
45 minutes5 items
Remove the Old Window Frame
60 minutes6 items
Inspect and Prepare the Rough Opening
45 minutes6 items
5
Apply Flashing Tape
30 minutes2 items
6
Install the New Window
45 minutes4 items
7
Secure the New Window
60 minutes3 items
8
Apply Exterior Sealant
30 minutes4 items
9
Install Interior Trim and Sealant
60 minutes8 items
10
Test the New Window
15 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.