Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 10 · Test the New Window

Open and close the window sashes completely. Test any locking mechanisms or cranks to ensure they work smoothly. Check for drafts by holding a lit incense stick or a damp hand around the seals. Address any issues found.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 10 · Test the New Window

Open and close the window sashes completely. Test any locking mechanisms or cranks to ensure they work smoothly. Check for drafts by holding a lit incense stick or a damp hand around the seals. Address any issues found.

Videos for this step

Verify Window FunctionalityTest and Adjust Window OperationFunctionality Check

Tools and Materials

← Project

Window Replacement

Step 10 of 10·15 min left

Prepare the Window Opening
30 minutes4 items
Remove the Old Window Sash
45 minutes5 items
Remove the Old Window Frame
60 minutes6 items
Inspect and Prepare the Rough Opening
45 minutes6 items
Apply Flashing Tape
30 minutes2 items
Install the New Window
45 minutes4 items
Secure the New Window
60 minutes3 items
Apply Exterior Sealant
30 minutes4 items
Install Interior Trim and Sealant
60 minutes8 items
10
Test the New Window
15 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.