Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Inspect and Prepare the Rough Opening

Thoroughly clean out any debris, old caulk, or insulation from the rough opening. Inspect the wood for rot or damage and make any necessary repairs. Use a level and plumb bob to ensure the opening is square, level, and plumb. Shim as needed to create a perfectly square and plumb opening for the new window.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Inspect and Prepare the Rough Opening

Thoroughly clean out any debris, old caulk, or insulation from the rough opening. Inspect the wood for rot or damage and make any necessary repairs. Use a level and plumb bob to ensure the opening is square, level, and plumb. Shim as needed to create a perfectly square and plumb opening for the new window.

Videos for this step

Prepare Rough OpeningPrepare the Window OpeningPrepare the Rough Opening

Tools and Materials

← Project

Window Replacement

Step 4 of 10·4.8 hr left

Prepare the Window Opening
30 minutes4 items
Remove the Old Window Sash
45 minutes5 items
Remove the Old Window Frame
60 minutes6 items
4
Inspect and Prepare the Rough Opening
45 minutes6 items
5
Apply Flashing Tape
30 minutes2 items
6
Install the New Window
45 minutes4 items
7
Secure the New Window
60 minutes3 items
8
Apply Exterior Sealant
30 minutes4 items
9
Install Interior Trim and Sealant
60 minutes8 items
10
Test the New Window
15 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.