Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 10 · Sand and Finish

Using progressively finer grit sandpaper, sand all newly installed treads, risers, newel posts, and railings until they are smooth to the touch. Remove all dust. Apply your chosen finish (paint, stain, varnish, or polyurethane) according to the manufacturer's instructions, allowing adequate drying time between coats.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 10 · Sand and Finish

Using progressively finer grit sandpaper, sand all newly installed treads, risers, newel posts, and railings until they are smooth to the touch. Remove all dust. Apply your chosen finish (paint, stain, varnish, or polyurethane) according to the manufacturer's instructions, allowing adequate drying time between coats.

Videos for this step

Sand the StaircaseSand Handrails and Newel PostsSand and Finish Oak Cladding

Tools and Materials

← Project

How to Update a Split-Level Entry Staircase

Step 10 of 10·6 hr left

Remove Existing Treads and Risers
120 minutes4 items
Inspect and Repair Stringers
60 minutes4 items
Cut and Fit New Treads
180 minutes5 items
Cut and Fit New Risers
120 minutes4 items
Attach New Treads
90 minutes4 items
Attach New Risers
75 minutes5 items
Install Newel Posts
150 minutes5 items
Install Balusters (Spindles)
240 minutes5 items
Install Handrail and Railing System
180 minutes6 items
10
Sand and Finish
360 minutes6 items