Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Finish New Treads

Once the adhesive has fully cured, sand the new treads smooth, starting with medium-grit sandpaper and progressing to finer grits. Wipe away all dust. Apply your chosen stain according to the manufacturer's instructions. Allow the stain to dry completely. Finally, apply several coats of a durable polyurethane or varnish, sanding lightly between coats with very fine-grit sandpaper (e.g., 220 grit) and wiping away dust. Ensure each coat is fully dry before applying the next.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Finish New Treads

Once the adhesive has fully cured, sand the new treads smooth, starting with medium-grit sandpaper and progressing to finer grits. Wipe away all dust. Apply your chosen stain according to the manufacturer's instructions. Allow the stain to dry completely. Finally, apply several coats of a durable polyurethane or varnish, sanding lightly between coats with very fine-grit sandpaper (e.g., 220 grit) and wiping away dust. Ensure each coat is fully dry before applying the next.

Videos for this step

Apply Polyurethane Finish to TreadsSeal Stained TreadsStain and Seal Treads

← Project

Stair Treads

Step 6 of 6·4 hr left

Remove Old Treads
60 minutes
Prepare Stair Structure
90 minutes
Measure and Cut Treads
120 minutes
Dry Fit Treads
30 minutes
Install New Treads
180 minutes
6
Finish New Treads
240 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.