Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Prepare Stair Structure

After removing the old treads, inspect the stair stringers and risers for any damage, loose nails, or debris. Remove any protruding nails using a hammer and nail set, or pull them out with the pry bar. Clean away any dust, old adhesive, or dirt from the surfaces where the new treads will be installed. Fill any small holes or gouges with wood filler and allow it to dry completely. Sand down any rough spots on the stringers and risers to ensure a smooth surface.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Prepare Stair Structure

After removing the old treads, inspect the stair stringers and risers for any damage, loose nails, or debris. Remove any protruding nails using a hammer and nail set, or pull them out with the pry bar. Clean away any dust, old adhesive, or dirt from the surfaces where the new treads will be installed. Fill any small holes or gouges with wood filler and allow it to dry completely. Sand down any rough spots on the stringers and risers to ensure a smooth surface.

Videos for this step

Prepare the Stair StructurePrepare Existing Stairs for InstallationRemove Carpet & Prepare Subtreads

← Project

Stair Treads

Step 2 of 6·11 hr left

Remove Old Treads
60 minutes
2
Prepare Stair Structure
90 minutes
3
Measure and Cut Treads
120 minutes
4
Dry Fit Treads
30 minutes
5
Install New Treads
180 minutes
6
Finish New Treads
240 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.