Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Install New Treads

Apply a generous bead of construction adhesive along the top of the riser and along the stringers where the tread will sit. Carefully place the tread into position. From underneath, or through the riser if accessible, pre-drill pilot holes and then drive screws through the stringers into the underside of the tread. Ensure the screws are countersunk so they are not visible or will be covered by finishing. Alternatively, if screwing from the top is preferred and acceptable for the finish, pre-drill and countersink screws on the tread surface, then cover with wood plugs or filler.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Install New Treads

Apply a generous bead of construction adhesive along the top of the riser and along the stringers where the tread will sit. Carefully place the tread into position. From underneath, or through the riser if accessible, pre-drill pilot holes and then drive screws through the stringers into the underside of the tread. Ensure the screws are countersunk so they are not visible or will be covered by finishing. Alternatively, if screwing from the top is preferred and acceptable for the finish, pre-drill and countersink screws on the tread surface, then cover with wood plugs or filler.

Videos for this step

Install New TreadsInstall Your TreadsInstall First Tread

← Project

Stair Treads

Step 5 of 6·7 hr left

Remove Old Treads
60 minutes
Prepare Stair Structure
90 minutes
Measure and Cut Treads
120 minutes
Dry Fit Treads
30 minutes
5
Install New Treads
180 minutes
6
Finish New Treads
240 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.