Step 9 · Final Inspection and System Startup

Once construction is complete, contact the local health department or building inspector to schedule a final inspection. The inspector will verify that the system was installed according to the approved plans and local codes. After passing inspection, the system can be put into service. Avoid heavy loads or landscaping directly over the drainfield.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 9 · Final Inspection and System Startup

Once construction is complete, contact the local health department or building inspector to schedule a final inspection. The inspector will verify that the system was installed according to the approved plans and local codes. After passing inspection, the system can be put into service. Avoid heavy loads or landscaping directly over the drainfield.

Videos for this step

Inspection, Backfilling, and GradingFinalize Site Grading and System CompletionPass First County Inspection

Tools and Materials

← Project

Septic System Installation

Step 9 of 9·2 hr left

Site Evaluation and Soil Testing
480 minutes5 items
Septic System Design
360 minutes4 items
Obtain Permits and Approvals
180 minutes4 items
Excavation
480 minutes5 items
Septic Tank Installation
240 minutes7 items
Drainfield Installation
720 minutes7 items
Connect Inlet and Outlet Piping
180 minutes5 items
Backfilling and Final Grading
360 minutes4 items
9
Final Inspection and System Startup
120 minutes2 items