Step 3 · Obtain Permits and Approvals

File the design plans, site evaluation reports, and application forms with the relevant local authority. This process may involve fees and a review period. Ensure all requirements are met before excavation begins.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Obtain Permits and Approvals

File the design plans, site evaluation reports, and application forms with the relevant local authority. This process may involve fees and a review period. Ensure all requirements are met before excavation begins.

Videos for this step

Building PermitSubmit Permit Application and Await ApprovalMeet with a Permit Technician

Tools and Materials

← Project

Septic System Installation

Step 3 of 9·38 hr left

Site Evaluation and Soil Testing
480 minutes5 items
Septic System Design
360 minutes4 items
3
Obtain Permits and Approvals
180 minutes4 items
4
Excavation
480 minutes5 items
5
Septic Tank Installation
240 minutes7 items
6
Drainfield Installation
720 minutes7 items
7
Connect Inlet and Outlet Piping
180 minutes5 items
8
Backfilling and Final Grading
360 minutes4 items
9
Final Inspection and System Startup
120 minutes2 items