Step 6 · Drainfield Installation

Lay perforated pipes in the excavated trenches or bed, ensuring the correct slope. Cover pipes with washed gravel, maintaining the specified depth. Wrap the gravel and pipes with geotextile fabric to prevent soil from clogging the system. Ensure proper distribution of effluent from the tank to the drainfield.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Drainfield Installation

Lay perforated pipes in the excavated trenches or bed, ensuring the correct slope. Cover pipes with washed gravel, maintaining the specified depth. Wrap the gravel and pipes with geotextile fabric to prevent soil from clogging the system. Ensure proper distribution of effluent from the tank to the drainfield.

Videos for this step

Installing Perforated Pipes and Washed RockLay Permeable Base LayerInstall Drain Field and Transport Lines

Tools and Materials

← Project

Septic System Installation

Step 6 of 9·23 hr left

Site Evaluation and Soil Testing
480 minutes5 items
Septic System Design
360 minutes4 items
Obtain Permits and Approvals
180 minutes4 items
Excavation
480 minutes5 items
Septic Tank Installation
240 minutes7 items
6
Drainfield Installation
720 minutes7 items
7
Connect Inlet and Outlet Piping
180 minutes5 items
8
Backfilling and Final Grading
360 minutes4 items
9
Final Inspection and System Startup
120 minutes2 items