Step 1 · Site Evaluation and Soil Testing

Assess the property for potential leach field locations, considering setbacks from wells, property lines, and water bodies. Perform soil percolation tests (perc tests) to determine the soil's absorption rate. This is crucial for designing a drainfield that meets local regulations and functions effectively.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Site Evaluation and Soil Testing

Assess the property for potential leach field locations, considering setbacks from wells, property lines, and water bodies. Perform soil percolation tests (perc tests) to determine the soil's absorption rate. This is crucial for designing a drainfield that meets local regulations and functions effectively.

Videos for this step

Perform a Soil Test (Perc Test)Site Assessment & Septic System Planning

Tools and Materials

← Project

Septic System Installation

Step 1 of 9·52 hr left

1
Site Evaluation and Soil Testing
480 minutes5 items
2
Septic System Design
360 minutes4 items
3
Obtain Permits and Approvals
180 minutes4 items
4
Excavation
480 minutes5 items
5
Septic Tank Installation
240 minutes7 items
6
Drainfield Installation
720 minutes7 items
7
Connect Inlet and Outlet Piping
180 minutes5 items
8
Backfilling and Final Grading
360 minutes4 items
9
Final Inspection and System Startup
120 minutes2 items