Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Install Trim or Skirt Board (if applicable)

If your design includes a skirt board or trim piece around the base of the newel post, cut it to size and attach it. This typically involves mitering corners for a clean appearance and securing the trim to the floor and the newel post with finish nails or screws.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Install Trim or Skirt Board (if applicable)

If your design includes a skirt board or trim piece around the base of the newel post, cut it to size and attach it. This typically involves mitering corners for a clean appearance and securing the trim to the floor and the newel post with finish nails or screws.

Videos for this step

Install Decorative MoldingInstall Molding and FinishInstall Newel Post Base Trim

Tools and Materials

← Project

How to Install a New Newel Post

Step 5 of 6·50 min left

Mark Newel Post Location
10 minutes3 items
Prepare Post Base for Attachment
20 minutes5 items
Attach Mounting Hardware (if applicable)
15 minutes4 items
Position and Secure Newel Post
45 minutes9 items
5
Install Trim or Skirt Board (if applicable)
30 minutes6 items
6
Check for Stability and Finish
20 minutes5 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.