Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Position and Secure Newel Post

Carefully position the newel post over the marked location. Use shims if necessary to ensure it is plumb (perfectly vertical). Secure the post using the appropriate fasteners. This could involve driving lag screws through the mounting flange or post base into floor joists or blocking, or using specialized post mounting systems. Ensure the post is stable and does not wobble.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Position and Secure Newel Post

Carefully position the newel post over the marked location. Use shims if necessary to ensure it is plumb (perfectly vertical). Secure the post using the appropriate fasteners. This could involve driving lag screws through the mounting flange or post base into floor joists or blocking, or using specialized post mounting systems. Ensure the post is stable and does not wobble.

Videos for this step

Install and Level the Newel PostPosition and Temporarily Secure Newel PostShim the Base (if necessary) and Install the Newel Post

Tools and Materials

← Project

How to Install a New Newel Post

Step 4 of 6·1.6 hr left

Mark Newel Post Location
10 minutes3 items
Prepare Post Base for Attachment
20 minutes5 items
Attach Mounting Hardware (if applicable)
15 minutes4 items
4
Position and Secure Newel Post
45 minutes9 items
5
Install Trim or Skirt Board (if applicable)
30 minutes6 items
6
Check for Stability and Finish
20 minutes5 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.