Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Prepare Post Base for Attachment

Depending on the installation method, you may need to prepare the bottom of the newel post. If using a mounting flange, ensure the post base is flat and square for proper seating. If direct screwing, you might need to pre-drill pilot holes through the post or mark the post for corresponding holes in the floor.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Prepare Post Base for Attachment

Depending on the installation method, you may need to prepare the bottom of the newel post. If using a mounting flange, ensure the post base is flat and square for proper seating. If direct screwing, you might need to pre-drill pilot holes through the post or mark the post for corresponding holes in the floor.

Videos for this step

Prepare Newel Post for Threaded RodPrepare Newel PostPrepare the Floor Base (if replacing a post)

Tools and Materials

← Project

How to Install a New Newel Post

Step 2 of 6·2.2 hr left

Mark Newel Post Location
10 minutes3 items
2
Prepare Post Base for Attachment
20 minutes5 items
3
Attach Mounting Hardware (if applicable)
15 minutes4 items
4
Position and Secure Newel Post
45 minutes9 items
5
Install Trim or Skirt Board (if applicable)
30 minutes6 items
6
Check for Stability and Finish
20 minutes5 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.