Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Install New Pump and Connect Piping

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Carefully lower the newly prepared pump into the center of the pit. Ensure the pump is sitting flat on the bottom and that its float switch has ample room to move up and down without hitting the pit walls. Measure and cut the vertical PVC pipe to the correct length to fit between the new pump's adapter and the existing discharge line, accounting for the height of the new check valve. It's best to install a new check valve. A new valve typically includes two rubber couplings and four clamps. Slide the clamps and couplings onto the pipe ends. Insert the check valve, making sure the flow-direction arrow points UP, away from the pump. Position the valve and couplings, then firmly tighten all four band clamps with a screwdriver or nut driver.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Install New Pump and Connect Piping

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Carefully lower the newly prepared pump into the center of the pit. Ensure the pump is sitting flat on the bottom and that its float switch has ample room to move up and down without hitting the pit walls. Measure and cut the vertical PVC pipe to the correct length to fit between the new pump's adapter and the existing discharge line, accounting for the height of the new check valve. It's best to install a new check valve. A new valve typically includes two rubber couplings and four clamps. Slide the clamps and couplings onto the pipe ends. Insert the check valve, making sure the flow-direction arrow points UP, away from the pump. Position the valve and couplings, then firmly tighten all four band clamps with a screwdriver or nut driver.

Videos for this step

Install, Connect, and Test the New PumpInstall the Check ValvePlace Pump in Sump Pit

Tools and Materials

← Project

How to Replace a Submersible Sump Pump

Step 5 of 7·55 min left

Disconnect Power and Prepare the Area
10 mins3 itemsBeginner
Disconnect the Discharge Pipe
15 mins4 itemsIntermediate
Remove the Old Pump
10 mins4 itemsIntermediate
Prepare New Pump and Clean Pit
20 mins6 itemsIntermediate
5
Install New Pump and Connect Piping
30 mins8 itemsAdvanced
6
Test the Pump Operation
15 mins2 itemsBeginner
7
Finalize and Secure
10 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.