Step 4 · Prepare New Pump and Clean Pit

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Before installing the new pump, take the opportunity to clean the sump pit. Use a wet/dry vac or a scoop to remove any gravel, mud, and debris from the bottom of the pit. Unpack your new sump pump and review the manufacturer's instructions. Take the new threaded male PVC adapter and wrap its threads with 3 to 4 layers of Teflon tape. Apply the tape in a clockwise direction as you face the open end of the fitting. This ensures the tape tightens as you screw the fitting in. Hand-thread the adapter into the pump's discharge port, then use channel-lock pliers to give it a final one or two turns until it's snug. Do not over-tighten, as this can crack the plastic housing.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Prepare New Pump and Clean Pit

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Before installing the new pump, take the opportunity to clean the sump pit. Use a wet/dry vac or a scoop to remove any gravel, mud, and debris from the bottom of the pit. Unpack your new sump pump and review the manufacturer's instructions. Take the new threaded male PVC adapter and wrap its threads with 3 to 4 layers of Teflon tape. Apply the tape in a clockwise direction as you face the open end of the fitting. This ensures the tape tightens as you screw the fitting in. Hand-thread the adapter into the pump's discharge port, then use channel-lock pliers to give it a final one or two turns until it's snug. Do not over-tighten, as this can crack the plastic housing.

Videos for this step

Disconnect and Remove Old Sump PumpInstall New Discharge PipingRemove the Pump

Tools and Materials

← Project

How to Replace a Submersible Sump Pump

Step 4 of 7·1.3 hr left

Disconnect Power and Prepare the Area
10 mins3 itemsBeginner
Disconnect the Discharge Pipe
15 mins4 itemsIntermediate
Remove the Old Pump
10 mins4 itemsIntermediate
4
Prepare New Pump and Clean Pit
20 mins6 itemsIntermediate
5
Install New Pump and Connect Piping
30 mins8 itemsAdvanced
6
Test the Pump Operation
15 mins2 itemsBeginner
7
Finalize and Secure
10 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.